IJSRP Logo
International Journal of Scientific and Research Publications

IJSRP, Volume 9, Issue 3, March 2019 Edition [ISSN 2250-3153]


Impact of the Shop Drawings on Accuracy of Estimated Cost of Construction Projects
      Hadeer N. Migahed, Ibrahim M. Mahdi, Ibrahim Abdul Rashid
Abstract: Meeting the projects estimated cost is a main target in construction project especially in mega projects. The objective of this paper is assessing the impact of shop drawings in meeting project cost target. A comprehensive literature reviews as well as survey for industry experts opinions to identify that impact were carried out.

Reference this Research Paper (copy & paste below code):

Hadeer N. Migahed, Ibrahim M. Mahdi, Ibrahim Abdul Rashid (2019); Impact of the Shop Drawings on Accuracy of Estimated Cost of Construction Projects; International Journal of Scientific and Research Publications (IJSRP) 9(3) (ISSN: 2250-3153), DOI: http://dx.doi.org/10.29322/IJSRP.9.03.2019.p8731
©️ Copyright 2011-2023 IJSRP - All rights reserved. Use of this web site signifies your agreement to the terms and conditions.